Melt-blown nonwoven fabric, and production process and apparatus for the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9404207
APP PUB NO 20160040335A1
SERIAL NO

14921756

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

It is an object of the present invention to provide a stable production process for a melt-blown nonwoven fabric comprising thin fibers and having extremely few thick fibers [number of fusion-bonded fibers] formed by fusion bonding of thermoplastic resin fibers to one another, and an apparatus for the same. The present invention relates to a melt-blown nonwoven fabric comprising polyolefin fibers and having (i) a mean fiber diameter of not more than 2.0 μm, (ii) a fiber diameter distribution CV value of not more than 60%, and (iii) 15 or less fusion-bonded fibers based on 100 fibers; a production process for a melt-blown nonwoven fabric characterized by feeding cooling air of not higher than 30° C. from both side surfaces of outlets of slits 31 from which high-temperature high-velocity air is gushed out and thereby cooling the spun molten resin; and a production apparatus for the same.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUI CHEMICALS INCTOKYO 104-0028

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kajiyama, Shingo Ichihara, JP 5 13
Kubo, Takayuki Ichihara, JP 53 1130
Matsubara, Akio Ichihara, JP 33 393
Shiode, Hirohisa Yokohama, JP 12 34
Suzuki, Kenichi Ichihara, JP 402 3766

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00