Integration of memory devices with different voltages

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9406687
SERIAL NO

14664940

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Device and method for forming a device are presented. The method includes providing a substrate prepared with at least a memory cell region having first and second sub-regions and a logic region having input/output (I/O) region and core region. First voltage memory cell is formed in the first sub-region and second voltage memory cell is formed in the second sub-region of the memory cell region of the same substrate. The first voltage memory cell operates in a first voltage and the second voltage memory cell operates in a second voltage which is higher than the first voltage. Each of the first and second voltage memory cells includes a split gate having first and second gates. The first gate is a storage gate having a control gate over a floating gate and the second gate is a wordline. Logic I/O device is formed in the I/O region and logic core device is formed in the core region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GLOBALFOUNDRIES SINGAPORE PTE. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jung, Sung Mun Singapore, SG 53 362
Lim, Yi Tat Singapore, SG 4 10
Yang, Jianbo Singapore, SG 89 274

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00