Semiconductor device and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9406694
SERIAL NO

14844036

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a semiconductor device includes a metal layer containing boron, a semiconductor film extending in a direction intersecting with a direction in which the metal layer extends, a charge storage film provided between the semiconductor film and the metal layer, a first dielectric film provided between the charge storage film and the metal layer, and a nitride film provided between the first dielectric film and the metal layer. The nitride film includes a first titanium nitride film provided in contact with the first dielectric film, a second titanium nitride film provided in contact with the metal layer, and an amorphous nitride film provided between the first titanium nitride film and the second titanium nitride film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIOXIA CORPORATIONTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikeno, Daisuke Mie, JP 44 435
Kitamura, Masayuki Mie, JP 98 1131
Sakata, Atsuko Mie, JP 92 849

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00