Vertebral osteosynthesis assembly formed by a vertebral osteosynthesis material and instruments for placing said material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9408642
APP PUB NO 20130150898A1
SERIAL NO

13817895

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In this assembly; each connecting piece comprises engaging means situated outside said conduit for engaging a connecting bar and outside said conduit for engaging on an anchor member, making it possible to grasp said connecting piece using a handling instrument. The assembly comprises at least one handling instrument comprising engaging means complementary to those comprised by each connecting piece. According to the invention, each anchor member is equipped with a proximal shaft, the length of which is such that it protrudes past the patient's skin after implantation of said anchor member on a vertebra. Each handling instrument is tubular and can be engaged on the proximal shaft of each anchor member so as to allow the movement of a connecting piece grasped by the instrument along the proximal shaft of each anchor member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEDICREA INTERNATIONALRILLIEUX-LA-PAPE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fernandez, Julius Memphis, US 1 32
Hsu, Victor Ambler, US 35 234
Labbe, Jean-Louis Noumea, FR 1 32
Wong, Chung Chek Kuching, MY 1 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00