Bladder driven linear cylinder and associated devices driven thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9408771
APP PUB NO 20120053495A1
SERIAL NO

13220348

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for manipulating the joint of a patient is provided. The apparatus comprises an actuator and a linkage. The actuator itself comprises: 1) a cylinder portion defining an interior cavity; and 2) an inflatable bladder member at least partially inside the cavity of the cylinder portion. The linkage is operatively positioned intermediate the actuator and the joint of the patient, the linkage configured to be activated and to flex the joint upon inflation of the bladder. A piston portion may also be provided and configured to move relative to cylinder portion within the cavity in response to inflation of the bladder. A patient connection and manipulation device may also be provided within the apparatus and configured to be attached relative to the patient, attached intermediate the linkage and the patient, and configured to at least partially assist with treatment upon activation of the linkage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ERMI LLC2872 WOODCOCK BOULEVARD SUITE 100 ATLANTA GA 30341

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Branch, Thomas P Atlanta, US 61 2110
Cunningham, Thomas Atlanta, US 13 112
Dittmar, Edward Marietta, US 26 124
Jacobs, Cale Suanee, US 5 59

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00