Battery cell assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9412980
APP PUB NO 20160111691A1
SERIAL NO

14516667

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery cell assembly having first and second rectangular-shaped end plates, a battery cell, and a metal spring clip are provided. The first rectangular-shaped end plate includes first and second grooves, and the second rectangular-shaped end plate includes first and second grooves. The battery cell is disposed between the first and second rectangular-shaped end plates. The metal spring clip has first and second end portions. The first end portion is disposed in the first groove of the first rectangular-shaped end plate, and the second end portion is disposed in the first groove of the second substantially rectangular-shaped end plate to bias the first rectangular-shaped end plate toward the second rectangular-shaped end plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ENERGY SOLUTION LTDTOWER 1 108 YEOUI-DAERO YEONGDEUNGPO-GU SEOUL 07335

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Garascia, Michael P Waterford, US 6 72
Smith, Alexander Jeffrey White Lake, US 14 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 9, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 9, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00