Plants with improved nitrogen utilization and stress tolerance

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9416367
APP PUB NO 20150096077A1
SERIAL NO

14563536

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to transgenic plants that have increased nitrogen use efficiency, stress tolerance, or both and that have been transformed using a novel vector construct including nucleic acid sequences that modulate nitrogen use in plants. In various embodiments, the vector construct includes one or more nucleic acid sequences selected from the group consisting of SEQ ID NO: 2, 4, 7, 9, 11, 13, 15, 17, 22, 24, 26, 28, 30, 32, 34, 36, or 38. The invention also relates to isolated vectors for transforming plants and to antibodies used for detecting transformed plants. The invention also relates to methods of expressing in plants the nucleic acid molecules corresponding to the nucleic acid sequences that modulate nitrogen use in plants or are modulated by nitrogen conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IOWA CORN PROMOTION BOARDC/O DENTONS DAVIS BROWN PC 215 10TH STREET SUITE 1300 DES MOINES IA 50309

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anthony, Alissa Nicole Cary, US 1 1
Beilinson, Vadim Research Triangle Park, US 26 143
Duck, Nicholas Research Triangle Park, US 10 78
Hinson, Jill Research Triangle Park, US 10 79
McLaren, James Chesterfield, US 9 10
Vande, Berg Brian Morrisville, US 28 121

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00