Method for conversion treating surface of magnesium alloy workpiece

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9416454
APP PUB NO 20140261896A1
SERIAL NO

14201930

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for conversion treating a surface of a magnesium alloy workpiece includes the following steps: providing a magnesium alloy workpiece, degreasing the magnesium alloy workpiece, acid pickling the magnesium alloy workpiece in a first acid pickling treatment step, surface conditioning the magnesium alloy workpiece in a first surface conditioning treatment step, acid pickling the magnesium alloy workpiece in a second acid pickling treatment step, surface conditioning the magnesium alloy workpiece in a second surface conditioning treatment step, pre-phosphating the magnesium alloy workpiece in a pre-phosphating treatment step, and phosphating the magnesium alloy workpiece in a phosphating treatment step to form a phosphating film on the surface of the magnesium alloy workpiece.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FU ZHUN PRECISION INDUSTRY (SHEN ZHEN) CO LTDNO 2 2ND DONGHUAN ROAD LONGHUA TOWN BAO' AN DISTRICT SHENZHEN CITY GUANGDONG PROVINCE
FOXCONN TECHNOLOGY CO LTD(236)NO 3-2 CHUNG SHAN ROAD TU-CHENG DIST NEW TAIPEI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Hao-Wei Shenzhen, CN 6 1
Gao, Yong-Hui Shenzhen, CN 1 0
Li, Wu-Bin Shenzhen, CN 2 1
Qian, Kun Shenzhen, CN 47 152

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00