Hydraulic circuit, and combination valve used in same hydraulic circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9416798
APP PUB NO 20140190158A1
SERIAL NO

14236089

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composite valve is used in a hydraulic circuit. The composite valve is interposed between a stack valve and a hydraulic power supplier and between the stack valve and a multifunction valve coupled to a hydraulic device. The composite valve includes: stop valves opening/closing communication between the hydraulic power supplier and the stack valve and stop valves opening/closing communication between the stack valve and the multifunction valve; and bypass circuits respectively including stop valves opening/closing communication between the hydraulic power supplier and the multifunction valve, the bypass circuits provided closer to the hydraulic power supplier than the stop valves. This structure makes it possible to simultaneously perform various functions: repair, checking, and/or maintenance on the stack valve; flushing; and repair, checking, maintenance, and/or a trial run of the hydraulic device. The composite valve has uniform circuit configurations, which facilitates production of the valve.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • U-TEC CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kondo, Yuji Osaka, JP 112 1713
Uenishi, Yukio Osaka, JP 6 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00