Optical system and image pickup apparatus including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9417436
APP PUB NO 20150098138A1
SERIAL NO

14492190

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical system includes, in order from object side: a positive first lens unit; and a positive second lens unit moving during focusing. The second lens unit includes, in order from object side, a front unit, an aperture stop, and a positive rear unit. The first unit includes a negative lens that has a convex surface facing object side and is arranged closest to object side, and three or more positive lenses on image side of the negative lens. A distance, on optical axis, from a lens surface on object side of a second positive lens counted from image side of the three or more positive lenses to a lens surface closest to image side of the first unit, and a distance, on optical axis, between a lens surface closest to object side and that closest to image side of the first unit are each appropriately set.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHATOKYO 146-8501

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shirasuna, Takashi Utsunomiya, JP 6 64

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00