Deployment and adjustment of airborne unmanned aerial vehicles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9421869
SERIAL NO

14866761

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This disclosure describes a power unmanned aerial vehicle (UAV) that may generate a current from a magnetic field of an overhead power line. In various implementations, while the power UAV is flying, the power UAV may receive another UAV at a platform. A control element of the power UAV may generate signals to cause the power UAV to fly to a location of a conductor of the power line. The control element may also determine a position of the secondary coil with respect to the power line and generate control signals to adjust the position of the secondary coil based on the determined position of the secondary coil, a determined safety distance, and/or a determined threshold distance for efficient current generation. A shielding substrate may also be provided to shield electronics of the power UAV or other UAVs from magnetic fields.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMAZON TECHNOLOGIES INCPO BOX 81226 SEATTLE WA 98108

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ananthanarayanan, Peruvemba Ranganathan Sai Sunnyvale, US 12 373
Dron, Anuj San Jose, US 19 466
Napoles, Adrian Cupertino, US 62 843
Sammeta, Rohit Sunnyvale, US 13 318
Zheng, Ming Cupertino, US 103 1163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 23, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00