Char-handling processes in a pyrolysis system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9422478
APP PUB NO 20130327629A1
SERIAL NO

13810405

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Char-handling processes for controlling overall heat balance, ash accumulation, and afterburn in a reheater are provided. Carbonaceous biomass feedstock is pyrolyzed using a heat transfer medium forming pyrolysis products and a spent heat transfer medium. The spent heat transfer medium is separated into segregated char and char-depleted spent heat transfer medium. The char-depleted spent heat transfer medium is introduced into a dense bed of heat transfer medium fluidized by a stream of oxygen-containing regeneration gas. All or a portion of the segregated char is combusted in the dense bed using the stream of oxygen-containing regeneration gas. A portion of the segregated char may be exported out of the pyrolysis system to control the overall heat balance and ash accumulation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENSYN RENEWABLES INC701 FOULK ROAD SUITE 2H WILMINGTON DE 19803

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Freel, Barry Ottawa, CA 26 1092
Frey, Stanley J Des Plaines, US 101 1000
Kulprathipanja, Sid Des Plaines, US 3 123
Myers, Daniel N Arlington Heights, US 42 653
Palmas, Paolo Des Plaines, US 113 1050
Sechrist, Paul A Des Plaines, US 112 1327

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00