Motor control device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9423777
APP PUB NO 20150061564A1
SERIAL NO

14379621

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A command value generating circuit determines an acceleration profile indicating changes in acceleration of a mechanical load over time. The acceleration profile is determined such that the mechanical load is accelerated from a stop at a first position to a peak velocity, and is decelerated from the peak velocity to stop at a second position, and that the absolute value of an acceleration during accelerating and decelerating the mechanical load is equal to or less than an upper limit acceleration, and that the acceleration is maintained at the upper limit acceleration for a period of time from starting to accelerate the mechanical load, and then, gradually decreased from the upper limit acceleration. The command value generating circuit determines a velocity profile indicating changes in the velocity of the mechanical load over time, according to the acceleration profile, and generates a position command value, according to the velocity profile.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310 JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ueda, Koichiro Chiyoda-ku, JP 46 416

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00