Process for vapor emission control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9427693
SERIAL NO

14514982

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vapor emission control system for recovering hydrocarbon vapors displaced as vessels are loading consisting of two stages of carbon adsorption vapor recovery units. The first stage with two or more parallel carbon beds recovers the heavier C4-C6+ hydrocarbons on a first carbon bed which are then removed as a gas via vacuum and then converted into a liquid product via a vapor-to-liquid conversion unit. Lighter C2-C3 hydrocarbon vapor discharged from the first stage is recovered on two or more parallel carbon beds of the second stage. The vapor is then removed via vacuum as a concentrated gas for use as fuel or sent to a flare. The hydrocarbon lean first portion of the off-gas from each vacuum desorption is recycled to the other in-parallel carbon bed. The load and regeneration cycles alternate for the two carbon beds in each of the two stages based on an optimized time cycle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • H.E.R.O., INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hill, Joel Tulsa, US 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 29, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00