Earth-boring tools and components thereof including material having hard phase in a metallic binder, and metallic binder compositions for use in forming such tools and components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9428822
APP PUB NO 20140284114A1
SERIAL NO

13847282

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Binder compositions for use in forming a bit body of an earth-boring bit include at least one of cobalt, nickel, and iron, and at least one melting point-reducing constituent selected from at least one of a transition metal carbide up to 60 weight percent, a transition metal boride up to 60 weight percent, and a transition metal silicide up to 60 weight percent, wherein the weight percentages are based on the total weight of the binder. Earth-boring bit bodies include a cemented tungsten carbide material comprising tungsten carbide and a metallic binder, wherein the tungsten carbide comprises greater than 75 volume percent of the cemented tungsten carbide material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAKER HUGHES HOLDINGS LLC17021 ALDINE WESTFIELD HOUSTON TX 77073

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Collins, Gabriel B Madison, US 12 449
Eason, Jimmy W The Woodlands, US 68 2049
Mirchandani, Prakash K Houston, US 54 1908
Oakes, James J Madison, US 15 532
Westhoff, James C Conroe, US 20 966

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00