Optical connection techniques and configurations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9435967
APP PUB NO 20160124166A1
SERIAL NO

14993049

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the present disclosure provide optical connection techniques and configurations. In one embodiment, an apparatus includes a receptacle for mounting on a surface of a package substrate, the receptacle having a pluggable surface to receive an optical coupler plug such that the optical coupler plug is optically aligned with one or more optical apertures of an optoelectronic assembly that is configured to emit and/or receive light using the one or more optical apertures in a direction that is substantially perpendicular to the surface of the package substrate when the optoelectronic assembly is affixed to the package substrate. Other embodiments may be described and/or claimed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATIONSANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Braunisch, Henning Chandler, US 146 1305
Chang, Peter L Portland, US 24 339
Liff, Shawna M Gilbert, US 195 1168

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00