System energy efficiency controller in smart energy network, control method thereof, and control method for terminal device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9436169
APP PUB NO 20140148964A1
SERIAL NO

13884963

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system energy efficiency controller in a smart energy network, a control method thereof, and a control method for a terminal device. The system energy efficiency controller includes a control decision module, a storage module, a power clock module, an internal communication module, and an external communication module. The storage module is connected to the control decision module, and stores temporary and permanent information data in the operation process of the storage system. The power clock module provides an internal clock, achieving timing synchronization of processors on the controller. The internal communication module provides two-way communication between the system energy efficiency controller and control implementation units of multiple terminal devices. The external communication module provides two-way communication between the system energy efficiency controller and a local optimizer. The multiple terminal devices include at least one of the terminal devices for the stages of energy production, storage, application and regeneration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENN SCIENCE & TECHNOLOGY DEVELOPMENT CO LTD065001 GUANGYANG ROAD NORTH DEVELOPMENT ZONE LANGFANG CITY HEBEI PROVINCE LANGFANG CITY HEBEI PROVINCE 065001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cai, Qizhi Langfang, CN 1 8
Dong, Shenglong Langfang, CN 1 8
Gan, Zhongxue Langfang, CN 24 979

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00