Fast platform hibernation and resumption of computing systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9436251
APP PUB NO 20130290760A1
SERIAL NO

13996480

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Fast platform hibernation and resumption for computing systems. An embodiment of an apparatus includes a volatile system memory, a nonvolatile memory, and a processor to operate according to an operating system, the processor to transition the apparatus to a first reduced power state upon receipt of a request, the transition to the first reduced power state including the processor to store context information for the computer in the volatile system memory. The apparatus further includes logic to transition the apparatus to a second reduced power state, the logic to copy the context data from the volatile system memory to the nonvolatile memory for the transition to the second reduced power state, where copying of the context data includes the logic to scan the volatile system memory to locate non-active memory elements in the volatile system memory, eliminate the non-active memory elements from the volatile system memory to generate compressed context data, and store the compressed context data in the nonvolatile memory.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTEL CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cooper, Barnes Tigard, US 119 3049
Siddiqi, Faraz A Portland, US 25 617

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00