Method of producing microstructure of nitride semiconductor and photonic crystal prepared according to the method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9437684
APP PUB NO 20140327015A1
SERIAL NO

14336978

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The method of producing a GaN-based microstructure includes a step of preparing a semiconductor structure provided with a trench formed in a main surface of the nitride semiconductor and a heat-treating mask covering a main surface of the nitride semiconductor excluding the trench, a first heat-treatment step of heat-treating the semiconductor structure under an atmosphere containing nitrogen element to form a crystallographic face of the nitride semiconductor on at least a part of a sidewall of the trench, a step of removing the heat-treating mask after the first heat-treatment step and a second heat-treatment step of heat-treating the semiconductor structure under an atmosphere containing nitrogen element to close an upper portion of the trench on the sidewall of which the crystallographic face is formed with a nitride semiconductor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CANON KABUSHIKI KAISHA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoshino, Katsuyuki Tokyo, JP 15 3646
Kawashima, Shoichi Kawasaki, JP 10 51
Kawashima, Takeshi Tokyo, JP 62 927
Nagatomo, Yasuhiro Kawasaki, JP 37 570

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00