Concurrent true and complement signal generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9438212
APP PUB NO 20140152366A1
SERIAL NO

13690130

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A circuit generates low-skew true and complement output signals from an input signal using an inverter, true signal generation circuitry, and complement signal generation circuitry. The inverter operates between a high-voltage reference source (VDD) and a low-voltage reference source (VSS) and inverts the input signal to generate a delayed complement input signal. The true signal generation circuitry, which comprises a p-type transistor in series with an n-type transistor, (i) operates between (a) one of VDD and VSS and (b) one of the true input signal and the complement input signal and (ii) generates a true output signal. The complement signal generation circuitry, which also comprises p-type transistor in series with an n-type transistor, (i) operates between (a) one of VDD and VSS and (b) one of the true input signal and the complement input signal and (ii) generates a complement output signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AVAGO TECHNOLOGIES INTERNATIONAL SALES PTE LIMITED1 YISHUN AVENUE 7 SINGAPORE 768923

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Patel, Manish Umedlal Karnataka, IN 9 32
Trivedi, Manish Uttar Pradesh, IN 12 109

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00