Power control method, user equipment, and base station for carrier aggregation with different configurations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9439154
APP PUB NO 20140023028A1
SERIAL NO

14039569

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of the present invention disclose a power control method, a user equipment, and a base station. The method according to an embodiment of the present invention includes the following: a user equipment UE receives a transmitter power control TPC command sent by a base station, where the TPC command is used to indicate a power adjustment value of one carrier; and if the UE does not send a physical uplink control channel PUCCH in a previous uplink subframe of a current uplink subframe of the one carrier, performing, by the UE, according to a PUCCH transmit power used when the UE sends a latest PUCCH from among multiple carriers and the power adjustment value, TPC accumulation to obtain an updated PUCCH transmit power of the one carrier, where the multiple carriers include the one carrier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONOR DEVICE CO LTDSHENZHEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guan, Lei Beijing, CN 353 1800
Lv, Yongxia Beijing, CN 87 1074
Zhang, Xingwei Beijing, CN 118 503

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00