Wellsite connector apparatus and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9441441
SERIAL NO

14859702

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wellsite connector apparatus and related method. In an exemplary embodiment, the method includes connecting a base plate to a first member via a first weld-less connection, the first member defining a first fluid passageway and being adapted to be connected to a first wellsite component; connecting a flange to a second member via a second weld-less connection, the second member defining a second fluid passageway and being adapted to be connected to a second wellsite component; and connecting the flange to the base plate via a third weld-less connection; wherein the first, second, and third weld-less connections are configured so that: the first and second fluid passageways are co-axial; and the first and second wellsite components are in fluid communication with each other, via at least the first and second fluid passageways, when the first and second members are connected to the first and second wellsite components, respectively.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WELLS FARGO BANK NATIONAL ASSOCIATION1525 WEST W T HARRIS BLVD CHARLOTTE NC 28262

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hickie, Barton Oklahoma City, US 19 44

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00