Developing apparatus and image forming apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9442425
APP PUB NO 20150338777A1
SERIAL NO

14714532

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A developing apparatus includes a developer bearing member which bears a developer, a developing container that includes a developer circulation path, a conveying member which is rotatably installed in the circulation path, and an outlet which is formed on a side surface of the circulation path facing the conveying member to discharge the developer. The conveying member includes a rotating shaft and a helical blade portion which is formed around the rotating shaft. The conveying member has a first region including a region facing the outlet and a second region adjacent to the first region at an upstream in a conveying direction of the conveying member. The helical blade portion is not formed in the first region, a protruding portion protruding from the rotating shaft is formed in at least a part of the first region, and the helical blade portion is formed in the second region.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHATOKYO TOKYO METROPOLIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsumoto, Atsushi Toride, JP 371 4805

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00