Solid-state image sensor and image pickup apparatus including the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9445019
APP PUB NO 20160234446A1
SERIAL NO

15016146

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid-state image sensor includes pixels each including first and second photoelectric conversion portions provided in a substrate, the second photoelectric conversion portion having lower sensitivity than the first photoelectric conversion portion; a barrier region provided between the first and second photoelectric conversion portions; a waveguide provided on a light-entrance side of the substrate and including a core and a cladding; and a protective layer provided between the waveguide and the substrate. Seen in a direction perpendicular to the substrate, a center of an exit face of the core is on a first-photoelectric-conversion-portion side with respect to a center of the barrier region in each pixel in a central part of a pixel area. A standard deviation of a refractive-index distribution of the protective layer in a region directly below the exit face of the core is 0.1 or smaller in an in-plane direction of the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CANON KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Numata, Aihiko Inagi, JP 62 206

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 13, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00