Process for manufacturing lithium titanium oxides

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9446964
APP PUB NO 20140050657A1
SERIAL NO

14113855

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a process for manufacturing, at a low cost and efficiently, lithium titanium oxides which are useful for electricity storage devices. A desired lithium titanium oxide can be obtained by heating at least both (1) a titanium compound and (2) a lithium compound that has a volume-mean particle diameter of 5 μm or less. The lithium compound is preferably obtained by adjusting the volume-mean particle diameter to 5 μm or less by pulverizing. It is preferable that the titanium compound and the lithium compound are heated together with (3) a lithium titanium oxide compound that has the same crystal structure as that of objective lithium titanium oxide. It is preferable that these materials are dry-blended prior to the heating.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ISHIHARA SANGYO KAISHA, LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Honma, Masatoshi Yokkaichi, JP 15 108
Okuda, Yusuke Yokkaichi, JP 12 15
Takeshima, Kazuyoshi Yokkaichi, JP 5 16
Takeuchi, Tsunehisa Yokkaichi, JP 4 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00