Hydrogen producing cell, hydrogen producing device, and energy system including the hydrogen producing device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9447509
APP PUB NO 20140072891A1
SERIAL NO

14115029

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrogen producing cell of the present invention is provided with an electrolyte supply hole, an electrolyte discharge hole, a first hydrogen circulation hole and a second hydrogen circulation hole respectively penetrating a housing. In disposing the hydrogen producing cell, the electrolyte supply hole is arranged on a vertically upper side than the electrolyte discharge hole, the first hydrogen circulation hole is arranged on a vertically upper side than the electrolyte supply hole, and the second hydrogen circulation hole is arranged on a vertically upper side than the electrolyte discharge hole. By this configuration, it is possible to considerably reduce the length of a pipe and the number of manifolds concerning the electrolyte and hydrogen, and to link the hydrogen producing cells with one another simply and rationally.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTDKADOMA-SHI OSAKA 571-0057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hato, Kazuhito Osaka, JP 40 334
Nomura, Takaiki Osaka, JP 58 479
Suzuki, Takahiro Osaka, JP 564 4900
Tamura, Satoru Osaka, JP 46 450
Tokuhiro, Kenichi Osaka, JP 22 366

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00