Melt blown fiber forming process and method of making fibrous structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9447523
APP PUB NO 20150125696A1
SERIAL NO

14366446

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A melt blowing process comprising: (a) providing a thermoplastic polymer material that includes at least one or a plurality of polyester polymers and at least one or a combination of different meltable metal phosphinates; and (b) melt blowing the thermoplastic polymer material into at least one fiber or a plurality of fibers, with each fiber having a diameter or thickness that is less than about 10 microns. The metal phosphinate is in an amount that (a) reduces the viscosity of the polyester polymer and (b) functions as a crystallizing agent, which at least promotes crystallization of the polyester polymer, when the thermoplastic polymer material is melt blown into the at least one fiber. Non-woven and woven fibrous structures can be made using fibers made from this process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
3M INNOVATIVE PROPERTIES COMPANYP O BOX 33427 ST PAUL MN 55133-3427

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fedorova, Nataliya V Woodbury, US 13 202
Moore, Eric M Roseville, US 32 771
Nam, Sehyun Woodbury, US 10 142
Percha, Pamela A Woodbury, US 22 346
Talwar, Sachin Woodbury, US 15 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00