Mat construction with environmentally resistant core

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9447547
APP PUB NO 20160177515A1
SERIAL NO

15056212

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mat having a non-wood core that provides strength and rigidity to the mat, and including a structure of a sheet, elongated members, a frame, compartments, or combinations thereof; and at least one outer layer associated with the core and made of a sheet, elongated members or combinations thereof, and typically wood. The core and outer layer(s) are integral or are joined together, and the structure of the core is made of one or more environmentally resistant materials to provide an extended service life when encountering rain, snow or other weather conditions that would eventually degrade wood. The mat has a load bearing capacity that is able to withstand a load of at least 500 to 800 psi or even 1000 psi without permanently deforming the core. Bumpers are preferably provided upon sides of the mat to protect them from damage due to transport or installation of the mat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUALITY MAT COMPANY6550 TRAM RD BEAUMONT TX 77713

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Calvert, Scott Beaumont, US 27 215
O'Brien, Thomas Wanaka, NZ 70 854
Penland, Rustin Beaumont, US 8 60
Penland,, Jr Joe Beaumont, US 31 188

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00