Fuel burner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9447966
APP PUB NO 20160138802A1
SERIAL NO

14546260

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A burner is provided. The burner includes an air compressor, an atomizing head having an air orifice, first and second fuel tanks, the first fuel tank being located at least partially below the atomizing head, and the second fuel tank being located at least partially above the atomizing head, a first fluid pathway connecting the air compressor to the air orifice of the atomizing head, a second fluid pathway having a first end configured to receive air from the air compressor, and a second end extending into the first fuel tank, a third fluid pathway connecting from the first fuel tank to the second fuel tank, and a fourth fluid pathway connecting the secondary fuel tank to a distribution point above the atomizing head. The second and third fluid pathway define at least a portion of a bubble pump. The burner is configured to use air from the air compressor to both (a) deliver fuel to the atomizing head, and (b) atomize the delivered fuel at the atomizing head.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BABINGTON TECHNOLOGY INC159 FABRICATION WAY ROCKY MOUNT NC 27804

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Babington, Robert S McLean, US 26 314

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00