Sampling, fault management, and/or context switching via a compute pipeline

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9449363
APP PUB NO 20150379730A1
SERIAL NO

14318562

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Apparatuses, systems, and methods may sample a texture, manage a page fault, and/or switch a context associated with the page fault. A three-dimensional (3D) graphics pipeline may provide texture sample location data corresponding to a texture, wherein sampling of the texture is to be executed external to the 3D graphics pipeline. A compute pipeline may execute sampling of the texture utilizing the texture sample location data and provide texture sample result data corresponding to the texture, wherein the 3D graphics pipeline may composite a frame utilizing the texture sample result data. The compute pipeline may manage a page fault, wherein the page fault and/or management of the page fault may be hidden from a graphics application. In addition, the compute pipeline may switch a compute context associated with the page fault to allow a graphics task not associated with the page fault to be executed and/or to prevent a stall.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fliflet, Brandon L Edh, US 3 25
Rao, Jayanth N Folsom, US 17 164
Tsakok, John A Folsom, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00