Method for manufacturing semiconductor device and semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9449949
APP PUB NO 20150262847A1
SERIAL NO

14475315

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first semiconductor chip has a first electrode pad, and a second semiconductor chip has a first through via and a second electrode pad joined to the via and aligned with the first electrode pad. A third semiconductor chip has a second through via, a third electrode pad joined to the via, wiring joined to the via, and a fourth electrode pad joined to the wiring and aligned with the second and third electrode pads. The semiconductor chips are stacked and electrically connected by joining the first to third electrode pads to one another, and gaps of the stacked body are filled with resin. The stacked body is secured to an adhesive material formed on a substrate and a solder bump formed on the substrate is joined to the fourth electrode. A molding resin encapsulates the stacked body and an adjacent surface of the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Komuta, Naoyuki Oita Oita, JP 16 190

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00