Semiconductor memory and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9450181
APP PUB NO 20140264227A1
SERIAL NO

14288321

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor memory includes a plurality of stripe-like active areas formed by stacking, in a direction perpendicular to a substrate, a plurality of layers extending parallel to the substrate, a first gate electrode formed on first side surfaces of the active areas, the first side surfaces being perpendicular to the substrate, a second gate electrode formed on second side surfaces of the active areas, the second side surfaces being perpendicular to the substrate. The layers are patterned in self-alignment with each other, intersections of the active areas and the first gate electrode form a plurality of memory cells, and the plurality of memory cells in an intersecting plane share the first gate electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOSHIBA MEMORY CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arai, Fumitaka Yokohama, JP 234 5189
Kiyotoshi, Masahiro Sagamihara, JP 99 3657
Ozawa, Yoshio Yokohama, JP 269 4923
Shirota, Riichiro Fujisawa, JP 205 7068
Yamamoto, Akihito Naka-gun, JP 99 1610

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00