Method of producing a semiconductor laser element, and semiconductor laser element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9450376
APP PUB NO 20150207293A1
SERIAL NO

14420411

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing a semiconductor laser element includes A) providing at least one carrier assemblage having a multiplicity of carriers for the semiconductor laser elements, C) providing at least one laser bar having a multiplicity of semiconductor laser diodes which include a common growth substrate and a semiconductor layer sequence grown thereon, D) fitting the laser bar on a top side of the carrier assemblage, and E) singulating to form the semiconductor laser elements after D).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • OSRAM OPTO SEMICONDUCTORS GMBH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Arzberger, Markus Regensburg, DE 10 14
Enzmann, Roland Regensburg, DE 16 27
Fehse, Robin Bad Abbach, DE 1 1
Graul, Markus Regensburg, DE 4 4
Haneder, Stephan Regensburg, DE 4 14
Horn, Markus Regensburg, DE 18 158
Kämpf, Mathias Burglengenfeld, DE 10 14
König, Harald Bernhardswald, DE 42 85
Swietlik, Tomasz Regensburg, DE 5 2
Walter, Christoph Regensburg, DE 71 787

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00