Method for data transmission, offload point device, user equipment and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9451516
APP PUB NO 20140177448A1
SERIAL NO

14189539

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The method for data transmission includes: updating, when a first air interface is unavailable, connection context information corresponding to service(s) of a user equipment on the first air interface, wherein the user equipment is connected to a core network through a first access network via the first air interface; sending a first message to the user equipment, wherein the first message carries updating information related to the updated connection context information; and performing data transmission with the user equipment according to the updated connection context information. This technical solution helps preventing services corresponding to data transmission performed via the first air interface from being interrupted when the first air interface is unavailable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HUAWEI TECHNOLOGIES CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wu, Ye Shenzhen, CN 91 228
Zhang, Wei Shenzhen, CN 2319 17796

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00