Dual pulse driven extreme ultraviolet (EUV) radiation source method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9451684
APP PUB NO 20160205757A1
SERIAL NO

15077187

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An extreme ultraviolet (EUV) radiation source pellet includes at least one metal particle embedded within a heavy noble gas cluster contained within a noble gas shell cluster. The EUV radiation source assembly can be activated by a sequential irradiation of at least one first laser pulse and at least one second laser pulse. Each first laser pulse generates plasma by detaching outer orbital electrons from the at least one metal particle and releasing the electrons into the heavy noble gas cluster. Each second laser pulse amplifies the plasma embedded in the heavy noble gas cluster triggering a laser-driven self-amplifying process. The amplified plasma induces inter-orbital electron transitions in heavy noble gas and other constitute atoms leading to emission of EUV radiation. The laser pulsing units can be combined with a source pellet generation unit to form an integrated EUV source system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Corliss, Daniel A Hopewell Junction, US 24 173
Deshpande, Sadanand V Bangalore, IN 24 579
Deshpande, Veeresh V Rueschlikon, CH 19 68
Gluschenkov, Oleg Poughkeepsie, US 263 3542
Krishnan, Sivarama Prasanthi Nilayam, IN 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00