Electroconductive polymer composition, electroconductive polymer material, electroconductive substrate, electrode and solid electrolytic capacitor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9452594
APP PUB NO 20130163150A1
SERIAL NO

13708512

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is an electroconductive polymer composition with a good film forming property and a high electroconductivity. Also, provided is an electroconductive polymer material and an electroconductive substrate with a high electroconductivity and transparency. Further, provided is a solid electrolytic capacitor with a high capacity and a low ESR. Disclosed is an electroconductive polymer composition, containing an electroconductive polymer obtained by an oxidation polymerization by using an oxidant in a reaction solution which contains at least one monomer selected from the group consisting of pyrrole, thiophene and derivatives thereof, a polyacid or a salt thereof as a dopant, and a solvent containing water and an aprotic solvent.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKIN CORPORATION1-1 ASAHI-CHO 7-CHOME SHIROISHI-SHI MIYAGI 989-0223

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nobuta, Tomoki Sendai, JP 68 529
Sugawara, Yasuhisa Sendai, JP 36 243
Suzuki, Satoshi Sendai, JP 709 8720
Tomioka, Yasuhiro Sendai, JP 28 172

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00