Rail component comprising flame retardant compositions, and methods of manufacture

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9453128
APP PUB NO 20120273738A1
SERIAL NO

13436791

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A railway vehicle component, wherein the component is a partition or a light cover, and wherein the component is molded or formed from a thermoplastic polymer composition comprising: a siloxane-containing copolymer in an amount effective to provide a total of 0.2 to 6.5 wt % of siloxane units based on the total weight of the polymers in the thermoplastic polymer composition, a bromine-containing polymer in an amount effective to provide 9 to 13 wt % of bromine, based on the total weight of the polymers in the thermoplastic polymer composition, and optionally a third polymer, wherein the wt % of the siloxane-containing copolymer, the bromine-containing polymer, and the optional third polymer, sum to 100 wt %, and 0.05 to 10 wt % of a light diffuser additive, based on the total weight of polymers in the thermoplastic polymer composition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SABIC GLOBAL TECHNOLOGIES B.V.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Evans, Thomas L Mt. Vernon, US 77 1119
Hoover, James Franklin Evansville, US 42 370
Sybert, Paul Dean Evansville, US 85 717

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00