Integrated structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9455261
SERIAL NO

14796938

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Some embodiments include an integrated structure having a stack of alternating dielectric levels and conductive levels, vertically-stacked memory cells within the conductive levels, an insulative material over the stack and a select gate material over the insulative material. An opening extends through the select gate material, through the insulative material, and through the stack of alternating dielectric and conductive levels. A first region of the opening within the insulative material is wider along a cross-section than a second region of the opening within the select gate material, and is wider along the cross-section than a third region of the opening within the stack of alternating dielectric levels and conductive levels. Channel material is within the opening and adjacent the insulative material, the select gate material and the memory cells. Some embodiments include methods of forming vertically-stacked memory cells.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICRON TECHNOLOGY, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Simsek-Ege, Fatma Arzum Boise, US 136 1273
Sun, Jie Boise, US 198 1707

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 27, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00