Process for producing cyclohexylbenzene

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9458067
APP PUB NO 20150011812A1
SERIAL NO

14373690

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a process for producing cyclohexylbenzene, hydrogen and benzene are introduced to a first hydroalkylation reaction zone which contains a hydroalkylation catalyst and which is operated under at least partly liquid phase conditions sufficient to effect hydroalkylation of benzene to produce a mixed liquid/vapor phase effluent comprising cyclohexylbenzene and unreacted benzene, wherein at least a portion of the unreacted benzene is in the vapor phase. At least a portion of the effluent is cooled to condense a liquid phase stream containing at least some of the cyclohexylbenzene in the effluent portion and leave a residual stream containing at least some of the unreacted benzene and cyclohexylbenzene. At least a portion of the liquid stream is recycled to the first hydroalkylation reaction zone or to contact the mixed phase effluent exiting the first hydroalkylation reaction zone. Other methods of cooling the reaction effluent are disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • EXXONMOBIL CHEMICAL PATENTS INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Becker, Christopher L Manhattan, US 66 181
Kuechler, Keith H Friendswood, US 99 1467
Lattner, James R LaPorte, US 157 1527
Nair, Hari Houston, US 39 105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00