Method and device for generating electrical energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9458762
APP PUB NO 20140033732A1
SERIAL NO

13856115

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The method and the apparatus described are used for generating electrical energy in a combined system comprising a power plant and a low-temperature air separation unit. A feed air stream is compressed in a main air compressor, cooled, and introduced into a distillation column system having a high-pressure column and a low-pressure column. A first oxygen-enriched stream from the distillation column system is introduced into the power plant. In a first operating mode, cryogenic liquid from the distillation column system is introduced into a liquid tank and is stored there at least in part. In a second operating mode, stored cryogenic liquid is removed from the liquid tank and introduced into the distillation column system. A second process fluid from the distillation column system is heated and then actively depressurized in a hot expansion turbine. In addition, in the second operating mode, a nitrogen-enriched product stream from the high-pressure column is also heated to a high temperature and then depressurized in the hot expansion turbine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LINDE AKTIENGESELLSCHAFTKLOSTERHOFSTR 1 MUNCHEN 80331

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goloubev, Dimitri Munich, DE 17 46

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00