Selective importance sampling

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9460243
APP PUB NO 20140278309A1
SERIAL NO

13837900

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Selective importance sampling includes: first phase importance sampling of a plurality of data points to form a first subset of data points; determining a center of gravity of the first subset; determining, based upon the center of gravity, an orthogonal hyperplane; and a second phase importance sampling comprising: determining, for each point in the first subset, whether each point is above the hyperplane; and forming a second subset of data points, wherein the second subset is a subset of the first subset and wherein the second subset excludes each point of the first subset that has been determined to be above the hyperplane. The second subset also excludes all points within an ellipse below the hyperplane. Critical radial distances are determined from binary search or projection of first phase samples onto center of gravity direction as well as the maximal radius of the first subset around the center of gravity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Joshi, Rajiv V Yorktown Heights, US 235 6121
Kanj, Rouwaida N Round Rock, US 40 715
Kerber, Pranita Mount Kisco, US 101 715

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 4, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00