Method of forming superjunction high voltage devices using wafer bonding

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9461109
APP PUB NO 20160268367A1
SERIAL NO

14751289

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of forming a superjunction device includes providing a semiconductor layer having first and second opposing main surfaces and a first doping concentration of a dopant of a first conductivity type, forming at least one device proximate the first main surface, forming at least one trench adjacent to the device and extending into the semiconductor layer from the first main surface, doping at least a portion of a sidewall of the trench with a dopant of a second, different conductivity type to form a first region in the semiconductor layer adjacent to the sidewall and extending at least partially between the first and second main surfaces, providing a substrate with a first dielectric layer arranged thereon, bonding the first dielectric layer to the first main surface to cover the trench and at least a portion of the device, and removing the substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ICEMOS TECHNOLOGY LTDNORTHERN IRELAND BANGOR ARDS AND NORTH DOWN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, Samuel Tempe, US 26 66
Ishiguro, Takeshi Fukushima-ken, JP 48 553

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00