Secondary battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9461345
APP PUB NO 20160079638A1
SERIAL NO

14754246

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A secondary battery supplying electrical power to a load comprises a battery unit, at least one PTC temperature sensing device and a load switch. The battery unit is encompassed by a battery shell. The PTC temperature sensing device is disposed on a primary surface of the battery shell to effectively sense a temperature of the battery unit. The load switch connects to the battery unit and a load and determines whether the battery unit and the load switch are in electrical connection or in an open circuit state upon resistance variation of the PTC temperature sensing device. When the resistance of the PTC temperature sensing device increases by a threshold times within a specific temperature variation or time period, the load switch receives a control signal and accordingly switches to an open circuit state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POLYTRONICS TECHNOLOGY CORPNO 24-1 INDUSTRY E RD 4TH HSINCHU SCIENCE PARK HSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chu, Fu Hua Taipei, TW 21 156
Tseng, Chun Teng Sanwan Township, Miaoli County, TW 30 151
Wang, David Shau Chew Taipei, TW 67 385

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 4, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00