Combined furnace system for fire refining red impure copper

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9464845
APP PUB NO 20140102660A1
SERIAL NO

14118909

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combined furnace system for fire refining red impure copper, comprising in order: a shaft furnace (2) for smelting red impure copper raw material into red impure copper liquid; a red impure copper liquid groove (4); at least one rotary furnace (5) for refining and producing refined copper liquid by means of oxidation reduction; a refined copper liquid groove (6). The combined furnace system is characterized in that the system comprises a tilting furnace (3) between the shaft furnace (2) and the red impure copper liquid groove (4) for removing slag from red impure copper liquid having slag. The invention thereby provides a combined furnace system that easily removes slag, has a smooth, unobstructed red impure copper liquid groove, and smelts and refines with stable production efficiency.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JIANGXI RARE EARTH AND RARE METALS TUNGSTEN GROUP CORPORATIONNO 118 BEIJING WEST ROAD NANCHANG JIANGXI 330046

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rao, Yongping Jiangxi, CN 1 0
Yin, Jiajun Jiangxi, CN 1 0
Zhang, Bingyan Jiangxi, CN 1 0
Zhang, Xuanzhi Jiangxi, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00