Method and apparatus for maximizing nitrogen removal from wastewater

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9469558
APP PUB NO 20140091035A1
SERIAL NO

14043130

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reactor and control method thereof to maximize nitrogen removal and minimize aeration requirement through control of transient anoxia and aerobic SRT, repression of NOB, and control of dynamic DO concentrations or aeration interval by keeping the reactor NH4 and NOx concentrations approximately equal has been proposed. Controls described in this invention maximizes the potential for TIN removal through nitrification, limited nitritation, nitritation, denitrification, limited denitritation, denitritation making use of 1) real time measurement of ammonia, nitrite, nitrate, 2) operational DO and the proper use of DO setpoints, and 3) proper implementation of transient anoxia within a wide range of reactor configurations and operating conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAMPTON ROADS SANITATION DISTRICT1434 AIR RAIL AVENUE P O BOX 5911 VIRGINIA BEACH NY 23471-0911
D C WATER & SEWER AUTHORITY500 OVERLOOK AVENUE SW WASHINGTON DC 20032

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bott, Charles B Virginia Beach, US 10 48
Miller, Mark Virginia Beach, US 285 8241
Regmi, Pusker Virginia Beach, US 10 86

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00