Substrate including a diamond layer and a composite layer of diamond and silicon carbide, and, optionally, silicon

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9469918
APP PUB NO 20150218694A1
SERIAL NO

14600592

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer substrate includes a diamond layer CVD grown on a composite layer. The composite layer includes particles of diamond and silicon carbide and, optionally, silicon. A loading level (by volume) of diamond in the composite layer can be ≧5%; ≧20%; ≧40%; or ≧60%. The multilayer substrate can be used as an optical device; a detector for detecting radiation particles or electromagnetic waves; a device for cutting, drilling, machining, milling, lapping, polishing, coating, bonding, or brazing; a braking device; a seal; a heat conductor; an electromagnetic wave conductor; a chemically inert device for use in a corrosive environment, a strong oxidizing environment, or a strong reducing environment, at an elevated temperature, or under a cryogenic condition; or a device for polishing or planarization of other devices, wafers or films.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • II-VI INCORPORATED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aghajanian, Michael Newark, US 3 18
Eissler, Elgin E Renfrew, US 26 47
Kraisinger, Charles J Saxonburg, US 4 18
Liu, Chao Butler, US 312 1349
Tanner, Charles D Saxonburg, US 9 25
Xu, Wen-Qing Medfield, US 50 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 18, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00