Semiconductor device and method of forming wire bondable fan-out EWLB package

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9472533
SERIAL NO

14548064

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device has a first semiconductor die and a first encapsulant deposited over the first semiconductor die. An interconnect structure is formed over the first semiconductor die and first encapsulant. A modular interconnect structure including a conductive via is disposed adjacent to the first semiconductor die. The first encapsulant is deposited over the modular interconnect structure. An opening is formed in the first encapsulant extending to the modular interconnect structure or to the interconnect structure. A second semiconductor die is disposed over the first semiconductor die. A bond wire is formed over the second semiconductor die and extends into the opening in the first encapsulant. A cap is formed over an active region of the second semiconductor die. A second encapsulant is deposited over the second semiconductor die and bond wire. Alternatively, a lid is formed over the second semiconductor die and bond wire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • STATS CHIPPAC PTE. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pendse, Rajendra D Fremont, US 158 2908

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 18, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 18, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00