Hydrothermal carbonization of sewage wastes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9475698
APP PUB NO 20150183641A1
SERIAL NO

14406955

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides methods for hydrothermally treating sewage wastes to preferably obtain valuable products, including fatty acids, carbon-neutral combustible hydrochar fuels, heavy metal salts for recycling into industrially important metals, and phosphoric acid and derivatives thereof. Fatty acids can be chemically transformed into useful products such as soaps, cosmetics and liquid transportation fuels such as biodiesel and conventional gasoline, diesel and aviation fuels; hydrochars created in the process can be combusted and the energy created used to generate electricity; heavy metal salts can be chemically reduced to form industrially important metals for use as catalysts; and phosphoric acid and its derivatives have very important roles as fertilizers in agriculture.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
REGENTS OF THE UNIVERSITY OF MINNESOTA600 MCNAMARA ALUMNI CENTER 200 OAK STREET SE MINNEAPOLIS MN 55455-2020

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heilmann, Steven M Afton, US 104 2937
Mikula, Anthony L Shell Lake, US 1 3
Schendel, Frederick J Oakdale, US 10 53
Valentas, Kenneth J Golden Valley, US 9 48
Von, Keitz Marc Gregor Minneapolis, US 3 6
Wood, Brandon Michael St. Paul, US 1 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00