Process for recovering sulfate and chloride salts from wastewater, mixed salts, and brines

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9475712
APP PUB NO 20160280571A1
SERIAL NO

15079174

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process is described for recovering alkali-chloride and alkali-sulfate salts from a salt solution. The salt solution comprises alkali metal, chloride and sulfate ions and is directed to a hydrous salt crystallization unit which crystallizes hydrated sulfate salts that comprise sulfate and at least one alkali metal. A purged solution from the hydrous salt crystallization unit is directed to a chloride salt crystallization unit while the hydrated sulfate salt crystals are melted to form an aqueous sulfate solution which is directed to a sulfate crystallization unit. Anhydrous sulfate salts are crystallized from the aqueous sulfate solution to form sulfate salt crystals comprising sulfate and at least one alkali metal. In the chloride salt crystallization unit, chloride salt is crystallized to form chloride salt crystals. A purge from the chloride salt crystallization unit is directed to the hydrous salt crystallization unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VEOLIA WATER TECHNOLOGIES INC4001 WESTON PKWY CARY NC 27513

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mack, Benjamin S Chicago, US 2 7
Rittof, Timothy J West Chicago, US 8 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00