Direct-current power supply utilizing system and direct-current microgrid network utilizing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9477248
APP PUB NO 20140183949A1
SERIAL NO

14237453

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A direct-current power supply utilizing system includes: at least one direct-current power supply that produces a direct-current output; an alternating-current commercial power supply; a direct-current converter that converts the alternating-current commercial power supply into direct-current power; and a direct-current load device that receives supply of direct-current power from both at least one direct-current power supply and the commercial power supply which has been converted into direct-current power, where a back-flow prevention diode is individually connected between the at least one direct-current power supply and the direct-current load device and between the direct-current converter and the direct-current load device, and a power supply priority supply device that preferentially supplies power to the direct-current load device from the side of the direct-current power supply is connected.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SION ELECTRIC CO LTD4-9 TOMIOKA4JO 4-CHOME TEINE-KU SAPPORO-SHI HOKKAIDO 0060014

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Murano, Minoru Hokkaido, JP 9 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00